Hollywood Bowl
Watford INTU
Full mechanical installation to new build 14 lane bowling alley.
Works comprised of:
- Design and installation of domestic hot and cold water system
- Compressed air system to Pinspotter machines
- Design and installation of heating, cooling and ventilation systems
- Kitchen canopy extract system
- Toilet extract and ventilation
- Local cooling to offices